Sand Lake Trail Feasibility Study

The Sand Lake Trails Feasibility Study draft report is now available for public review. After a year of analysis by Verity Engineering, this study was made possible through a grant secured by the Sand Lake Community Trails Task Force from the Hudson Valley Greenway. The study assesses the feasibility of developing a multi-use trail along the sewer corridor; however, at this stage, the project remains in the feasibility phase, with no current funding for design or construction. Residents are encouraged to review the draft and share any comments or concerns by emailing Supervisor Stephen Clemens at sclemens@sand-lake.us.